DopeyFish
Active Member
If it is all one parking structure, does that mean the entire site will be excavated at the same time?
If you had told me that The Well wouldn't even be the largest dig of the next decade, I would have never believed it.
no, they have like 3-4 tunnels they will make to connect them all.
They're doing it in 4 phases so it could take over a decade to finish