@crs1026 Please re-read my post, I made edits of some accidental errors before you made your post.
I doublechecked my math, and had already made corrections. Once rereading, please update your post.
Saw that the 2nd tracks (non platform) next to Guelph Central have been dug up and the earth striped. Looks like Metrolinx is getting ready to relay the tracks in advance of the 2nd platform. View attachment 232305View attachment 232306
Part of the program planned for this year for the line is the rebuilding of the siding at the station into a full-blown second mainline, with signalized access to it at both ends. And yes, there will be platform access to both tracks.
Dan
REALLY surprised nobody has posted this diagram of the Beach Layover mentioned at the Feb 5 Town Hall and released in one of the recent dumps! A big electrified yard just west of Burlington and East of the CN cut in!
View attachment 232471
(Photo credit to Disney overlords)
Will a second span be built over the Speed River? And 2 tracks to extend through the slow zone west of the station?
Time to charge these folks with trespassing. This is not their land since they gave it up. By the look of things, 13 people stopping a few hundred rides getting to from where they want to go by rail. Then there is the movement of goods. If any of use try this, we would be remove in matter of minutes or an hour.The picture in the Star article about the blockade also shows the latest from the third track addition to the Bayview Junction. Doesn't look like that much progress since previous pictures here.
View attachment 233161