drum118
Superstar
Going by Clarkson today, the structure is up with other work to be done before it goes into service late this year. Provision has been made to add another level or 2 at a later date.
Looking at Oakville structure, the GO logo is a lot smaller than the Erindale one.
I can't believe how slow the process is at Burlington and they still don't have the brick/block work in place yet. Some steel for the roof is in place with a lot more to be install.
No way this terminal/station will be complete for September, let alone this year and why March 2014 is being used now.
Sounds like there needs to be some house cleaning and coming up with real dates for these projects. I know the contractor and they are not a bad firm who has been able to bring projects on line as schedule or sooner. Could be some rethinking within Metrolinx design team causing these changes and slowing things down. It is a good way for ticking off riders as well being poor PR.
Looking at Oakville structure, the GO logo is a lot smaller than the Erindale one.
I can't believe how slow the process is at Burlington and they still don't have the brick/block work in place yet. Some steel for the roof is in place with a lot more to be install.
No way this terminal/station will be complete for September, let alone this year and why March 2014 is being used now.
Sounds like there needs to be some house cleaning and coming up with real dates for these projects. I know the contractor and they are not a bad firm who has been able to bring projects on line as schedule or sooner. Could be some rethinking within Metrolinx design team causing these changes and slowing things down. It is a good way for ticking off riders as well being poor PR.