BurlOak
Senior Member
I see a problem with branching subways. If each branch can be at-grade (maybe in a hydro or rail corridor), then it could be done. If each branch is tunneled, it seems like too much money for half the service.By the way, it wouldn't be a bad idea to serve Scarborough Centre with a branch of Relief Line. Just the timing isn't favorable for that (will take decades for the Relief Line to reach the point where a branch towards Scarborough Centre could split off).
Last edited: