Bumping this up for retrospect:
alexanderglista, Dec 11, 2016
SamStar said: ↑
http://urbantoronto.ca/forum/thread...cs-ertms-safety-shorter-headways.21483/unread
And platform string:
https://urbantoronto.ca/forum/threads/the-great-platform-height-debate.21140/page-11#post-1304503
Platform height is also going to be a concern if the station at the north portal is shared. (If VIA is sharing the tunnel, will RTM also do so?)
Addendum: Googling to find any technical articles on how the tunnel would be shared, especially for signalling, as it's a given that REM will be moving block marked up, and digital communication based. Will continue to search later, but for now, this string is intriguing, all of this is discussed:
Example:
alexanderglista, Dec 11, 2016
SamStar said: ↑
I find this article very interesting.
First, the is a mention that discussions will happen between VIA and the CDPQ facilitated by the federal ministry of Transportation to examine the share of the Mount-Royal Tunnel. I see a lot of positivism in such discussions regarding the funding of the HFT project by the Federal Governement. Even better if the insfrastructures can be shared between the future REM and VIA.
Second, Labeaume says trains to Ottawa-Toronto will use the Mount-Royal tunnel as well. I had not foreseen that coming and always assumed future HFT between Ottawa and Montreal would use a very similar path that they use today given VIA already owns the Alexandria sub.
I take Labeaume's words with a big train of salt. I don't know how they would reach Ottawa North of Mount-Royal. Using the Lachute or M&O sub maybe ? Time will tell.
Alex' answer has resonance to the discussion of "ETCCS" in the signals stringI don't know much about signalling systems, but due to REM being fully automated, would VIA need to be fully automated too? For VIA trains in the Mont Royal Tunnel to operate with REM, would they need to enter an "automatic" or "ATC-style" or "moving block" mode when they start to run on REM tracks, and disengage when they leave? This might allow the two systems to co-exist, as well as alleviate some concerns about light and heavy rail on the same tracks.
http://urbantoronto.ca/forum/thread...cs-ertms-safety-shorter-headways.21483/unread
And platform string:
https://urbantoronto.ca/forum/threads/the-great-platform-height-debate.21140/page-11#post-1304503
Platform height is also going to be a concern if the station at the north portal is shared. (If VIA is sharing the tunnel, will RTM also do so?)
Addendum: Googling to find any technical articles on how the tunnel would be shared, especially for signalling, as it's a given that REM will be moving block marked up, and digital communication based. Will continue to search later, but for now, this string is intriguing, all of this is discussed:
Example:
http://www.railroad.net/forums/viewtopic.php?f=59&t=166840Re: Will VIA Rail And REM Trains Share The Mount Royal Tunne
by mdvle » Mon Jan 29, 2018 2:18 pm
Guessing that the spokesperson was referring to some sort of automatic signal system / control system, but that would be problematic in a number of ways.
But I suspect it's irrelevant, and that these comments are political posturing.
The Réseau électrique métropolitain website gives us their service frequency. For the tunnel they are talking about 24 trains an hour(*) (or one every 2.5 minutes) and I don't see the ability to get a VIA train through every now and then.
* Deux-Montagnes every 5 minutes, West Island every 10 minutes, Airport every 10 minutes