W. K. Lis
Superstar
St. Clair Avenue West Area Transportation Master Plan
Notice of Completion
From link.
Notice of Completion
From link.
Issue Date: July 4, 2019
The City of Toronto has completed a Transportation Master Plan (TMP) to examine solutions to relieve traffic congestion, improve connections for pedestrians and cyclists, and increase access to public transit (including the future St.Clair-Old Weston SmartTrack Station), in the area of St. Clair Avenue West, between Keele Street and Old Weston Road. The TMP study followed the Municipal Class Environmental Assessment (EA) Study (Schedule C). The Ministry of Infrastructure (MOI) Public Work Class EA process was also followed in support of the purchase of MOI owned land required for the recommended improvements. The recommendations as documented in the TMP are to:
- Widen St. Clair Avenue West
- Extend Gunns Road to Union Street
- Extend Keele Street to meet the Gunns Road Extension
- Extend Davenport Road to Union Street
- Table of Contents & Executive Summary
- Chapter 1
- Chapter 2
- Chapter 3 Part 1
- Chapter 3 Part 2
- Chapter 4
- Chapter 5
- Chapter 6
- Chapter 7
- A Natural Environment Memo
- B Arborist Report
- C-1 Phase One Environmental Site Assessment (Study Area)
- C-2 Phase One Environmental Site Assessment (153 Weston Road)
- D Soil and Groundwater Management Plan
- E-1 Noise Memo
- E-2 Toronto Municipal Code, Chapter 591, Noise
- E-3 Toronto Municipal Code, Chapter 363, Vibrations from Construction Activity
- F-1 Stage 1 Archaeological Assessment Report
- F-2 Stage 1 -2 Archaeological Assessment Report
- F-3 Stage 1-2 Archaeological Assessment Report, Record of Indigenous Engagement
- G Cultural Heritage Existing Conditions and Impact Assessment Report
- H Utility Report
- I-1 Traffic Operational Analysis Report
- I-2 Transportation Analysis Summary
- J Long-Term Alternatives Evaluation Matrix
- K-1 Evaluation of Potential TTC Streetcar Stop Below St. Clair Rail Bridge
- K-2 Gunns Road Extension Alternatives Evaluation Memo
- K-3 Keele Street Extension Re-Alignment Option Evaluation
- K-4 Davenport Road Alignment Evaluation
- L-1 Detail Design: St. Clair Avenue West
- L-2 Detail Design: Gunns Road Extension
- L-3 Detail Design: Keele Street Extension to Gunns Road
- L-4 Detail Design: Davenport Road – Union Street Extension
- M-1 Record of Consultation
- M-2 St. Clair West Conceptual Constructability Review Workshop Memo
- N Environmental Impact Statement for The Proposed Keele Street Extension