YC Condos -- Yonge at College | 198m | 62s | Canderel | Graziani + Corazza

kris

Active Member
Member Bio
Joined
Oct 29, 2011
Messages
851
Reaction score
838
Lot's of surveying and underground testing being done.



They have this huge thing hanging from a crane looks like some kind of bore.



Cropping in from 40MP lets us see the measurements, they have it marked up to 20 meters.

 

DarkSideDenizen

Senior Member
Member Bio
Joined
Jul 21, 2010
Messages
1,293
Reaction score
2,067
They may be building a temporary ramp/access route for their neighbours, something similar to the ones erected at E&Y Tower and Aura sites.
 

whatever

Senior Member
Member Bio
Joined
Nov 25, 2007
Messages
2,604
Reaction score
241
I don't see why that would be necessary here. Aura and E&Y both caused existing parking garages to be cut off, which in turn required temporary ramps to go up. YC is sitting on its own site, with no underground connections to anything.

I assumed the extra work on the shoring and foundation had more to do with water issues. Murano had water problems, I seem to recall Karma having water problems, and now they're just being extra caution for YC
 

Benito

Senior Member
Member Bio
Joined
Mar 12, 2014
Messages
6,047
Reaction score
27,933
Location
Yonge and Bloor
From just now. Sorry about the square format. I was in a rush to get home and didn't notice that it was in square setting.
image.jpg
image.jpg
image.jpg
 

Attachments

  • image.jpg
    image.jpg
    2.1 MB · Views: 879
  • image.jpg
    image.jpg
    1.9 MB · Views: 866
  • image.jpg
    image.jpg
    2 MB · Views: 877

Top