Toronto YC Condos -- Yonge at College | 198.42m | 62s | Canderel | Graziani + Corazza

Lot's of surveying and underground testing being done.

M0r22d1.jpg


They have this huge thing hanging from a crane looks like some kind of bore.

JaB65U2.jpg


Cropping in from 40MP lets us see the measurements, they have it marked up to 20 meters.

9y8Qhzv.jpg
 
They may be building a temporary ramp/access route for their neighbours, something similar to the ones erected at E&Y Tower and Aura sites.
 
I don't see why that would be necessary here. Aura and E&Y both caused existing parking garages to be cut off, which in turn required temporary ramps to go up. YC is sitting on its own site, with no underground connections to anything.

I assumed the extra work on the shoring and foundation had more to do with water issues. Murano had water problems, I seem to recall Karma having water problems, and now they're just being extra caution for YC
 
From just now. Sorry about the square format. I was in a rush to get home and didn't notice that it was in square setting.
image.jpg
image.jpg
image.jpg
 

Attachments

  • image.jpg
    image.jpg
    2.1 MB · Views: 1,243
  • image.jpg
    image.jpg
    1.9 MB · Views: 1,223
  • image.jpg
    image.jpg
    2 MB · Views: 1,225

Back
Top