Toronto Massey Tower Condos | 206.95m | 60s | MOD Developments | Hariri Pontarini

Is the accessible entry that little cubby beside the retail area then?

there was supposed to be a ramp that starts immediately to the right of the entrance behind the column with a landing on the corner and another ramp to replace the right-most steps to the sidewalk, but that was nixed.
Now the accessible entrance is in the back of the building, which also serves as a mini lobby/waiting area for the automated parking.
 

massee.jpg
masse.jpg
 
there was supposed to be a ramp that starts immediately to the right of the entrance behind the column with a landing on the corner and another ramp to replace the right-most steps to the sidewalk, but that was nixed.
Now the accessible entrance is in the back of the building, which also serves as a mini lobby/waiting area for the automated parking.
There was never a ramp contemplated for the Yonge frontage, given site constraints and the heritage building. There is a handicapped lift on the north side of the old bank that makes the front door accessible to all.
 
Screenshot_20210427-193410_Instagram.jpg
 

Back
Top