Toronto Eaton Centre (Ongoing Renewal) | ?m | ?s | Cadillac Fairview | Zeidler

Update:
The construction of a new pedestrian bridge spanning Queen Street at Cadillac Fairview's Eaton Centre took a dramatic turn last month, when the WilkinsonEyre Architects and Zeidler Partnership-designed structure was moved from its temporary assembly point on James Street to its final position. In the weeks since, some of the final elements of the new bridge have started to take shape, with the new piece of infrastructure set to be complete in September.
 
Today.
IMG_3936.jpg
IMG_3937.jpg
IMG_3938.jpg
 

Attachments

  • IMG_3936.jpg
    IMG_3936.jpg
    388 KB · Views: 380
  • IMG_3937.jpg
    IMG_3937.jpg
    376.7 KB · Views: 410
  • IMG_3938.jpg
    IMG_3938.jpg
    378.9 KB · Views: 398
Looks like they have the streetcar wires up in time for them to be able to use that section of Queen during TIFF for the King and Chery streetcars.
 
From the looks of it I wouldn't be surprised if it opens sometime this month
I base my estimate of it opening this month on the fact that it was announced that it will open this month.
 
A useful guide, but no guarantee

The busy fall season is approaching. No way they are going to miss their deadline. Way too much money on the line.
 

Back
Top