Does anuone know the address for the webcam? Either it is down or the address has changed - can anyone confirm?

i think it the same, but yeah, it's been down for the last 24 hours give or take....
so i went out to get some photos this afternoon.


5738753858_d208cb5b70_b.jpg


5738756030_7550a10aae_b.jpg



ROCP I + II.... your days are numbered....... hahahaha!!!
5738207879_c87f8d47e8_b.jpg


5738209267_12cf686da5_b.jpg


and from far away....
5738752128_d19a3da2cf_b.jpg

5738150483_86d2b08fef_b.jpg



by me: steveve
 
Nice pictures, young lad -- especially the last one.

Please, periodically visit the site and post photos on this thread.
 
Goddamn, I hate that addition sticking out of College Parks ass. Would have been so nice if they had been able to complete the whole podium for that beautiful Eaton's skyscraper.
 
This morning

 
Aura yesterday:

5772651380_2dc4d2402b_b.jpg


and i'll add this one, just cause Aura will look HUGE from here!!! it will come close to the tip of the Bay Adelaide Centre in this view.... which is HUGE!

5772637792_2d56fd8c8e_z.jpg


by me: steveve!
 
We're actually turning into quite the metropolis, judging from that picture! Yonge Street will look very different if all the proposals will get built.
 
I guess phase-2 is the upper part, from DCN............http://dcnonl.com/cgi-bin/top10.pl?...32cbf0971066&projectid=9053182&region=ontario

CONDOMINIUM APARTMENT BUILDING
Proj: 9053182-15
Toronto, Metro Toronto Reg ON
NEGOTIATED/PLANS COMPLETE

Aura at College Park, Phase Two, 444 Yonge St at Gerrard St, M5B 2H4
$120,000,000 est
Start: September, 2011 Complete: April, 2013

Note:
Construction of the Phase One podium building is underway. Sub trades are being awarded sequentially as needed. Construction is anticipated fall 2011. Const Mgr will confirm the awarded trades when construction begins. Further update September 2011. http://www.collegeparkcondos.com/

Project:
concrete foundation, cast-in-place concrete structural frame, curtainwall exterior, masonry exterior, steel joist roof structure, fuel fired heating system, glass and steel roof structure; glass and stone cladding; various interior finishes; 15 elevators; proposed const of a 71-storey condo bldg with 932 units. The project will include 1,100,000 sq ft of residential space, in 932 units, and will be built above Phase One, a 250, 000 sq ft, four storey podium building, with 190,000 sq ft of retail space and recreational space for use by tenants four storey podium, that will be followed under report number 9114437.

Scope:
1,100,000 square feet; 71 storeys; 6 storeys below grade; 932 units; parking for 827 cars; 2 acres

Not bad....71 floors in 82 weeks.:)
 