News   Jul 15, 2024
 590     3 
News   Jul 15, 2024
 750     0 
News   Jul 15, 2024
 599     0 

RBC Centre (LEED Gold, CadFair, 41s, KPF/B+H/&Co.) COMPLETE

This one is moving fast. The speed is putting some condo projects to shame.
 
Are they really going with mullion-free corners, or are we just seeing a cutaway? Anyhoo, the details are looking good on this one...

Thx SNF.

42
 
^But they aren't onto the above ground floors yet. The excavation and construction of the below-grade portion of the building went very rapidly.
 
Remember its only half of the basement level that's done and the retaining wall on the south side was already completed when they built Simcoe Place. Ritz has the same advantage, hence how quickly they've dug that part of the hole.
 
Taken today from TD Centre:

RitzRBC.jpg


RitzRBC2.jpg
 
Not to stray off topic for long, but does anybody know what those little cartoon like people are for on the crane? They have them over at RBC as well, and I think Murano.

497448556_9b3e25aa24_o.jpg
 
They look like part of the logo for BNP Paribas - (a french bank) - are they involved in the financing at all?
 

Back
Top