Transportation to Pickering Airport
Since the federal government has said it is going ahead with the Pickering Airport, I wish to start discussing transportation that could be provided in and out of it.
For background,
there is a link to the most recent land use designations from 2013. Out of the entire area owned by the federal government, portions west of York Durham Line will become part of Rouge Park (assuming Ontario doesn't scuttle all those plans). The aiprot lands is roughly bounded by CP's Havelock sub, Brock Road, and Highway 7. The remainder will be for 'economic development'; I'm assuming warehouses etc.
Two potential public transit projects stick out to me at this time:
1. Union Pickering Express?
If Metrolinx wants to provide an express train to Pickering airport, it certainly has some rights of way to do so. Currently, they own the former CP spur running from the USRC to Leaside (Leaside spur, Don branch, I always forget its name). From there, trains can go to CP's yard to the Havelock and Belleville subs.
This is where it gets tricky. As is, the Havelock sub beside the yard is a tight area, and trying to fit passenger train operations in there without conflict is a challenge. In fact, GO trains were supposed to run there as part of The Big Move, but this challenge made Metrolinx bump it from the 15-year to the 25-year plan during the 5-year review. Extending GO trains along the Belleville sub to Seaton (Brock Road at Taunton Road) is still within the 15 year plan. The Pickering Airport is anticipated to be needed between 2027 and 2037, so that places developing the Havelock sub out of range. But the announcement of Pickering Airport was out of the blue and well after all of the work on the 5-year review was done.
Northeast of the CP Yard, the Havelock sub is the only rail sub that enters the designated airport lands. The alternative would be to run a new spur from the Belleville subdivision. There's going to be an evaluation of competing forces here: freight requirements and ROW space vs. property requirements and projected cost. In terms of freight requirements, I suspect the federal government is planning for Pickering airport to be intermodal, served by CP via the Havelock sub; the northeast/southwest boundary is oriented to it. Using a new spur off of the Belleville sub may be the only option.
2. Extension of viva purple
I think this is a sure bet. Currently, viva purple rapidways are to end at Cornell Centre Boulevard. To provide a good, cheap rapid transit connection to flyers in northern Toronto and York Region, as well as airport workers, it would be logical to just extend rapidways and/or bypass lanes east and north to the airport.
----
Feel free to discuss public transit, rapid transit, freight rail, or roads/highways to the future airport!