News   Nov 05, 2024
 75     0 
News   Nov 04, 2024
 561     0 
News   Nov 04, 2024
 791     5 

GO Transit: Service thread (including extensions)

yeah willowbrook certainly makes it complicated - iirc there's also some spurs for businesses that could be an issue too

but nah i'm south of kipling, it's more been a dream than anything because it's annoying getting to mimico and long branch stations.

theoretically for going downtown, the new park lawn station would be the preferred method for people in lakeshore village going on foot and to me that's just wild :p
I hear where you're coming from, growing up in South Etobicoke it's like you have to travel backwards first if your destination is downtown.

Even once Park Lawn GO comes online, if you live west of Islington it would be quicker to take the bus up to Kipling or Islington, compared to taking the streetcar to Park Lawn and taking the GO the rest of the way. The streetcar is just too damn slow.
 
I'm simply frustrated about how you actively ignore all of the evidence and arguments that contradict your claims, and immediately proceed just repeat them unchanged. If you deny the existance of GO's expansion plans why didn't you say so? How am I supposed to know why you keep repeating your claims after they have been disproven? This is a discussion forum, so we're trying to have a discussion. If you ignore everything that contradicts your argument and proceed to repeat the argument unchanged, that's not a discussion. That's just shouting into the void.

I didn't think that the plans for all-day express service on LSW needed to be cited because it's been consistently stated in every RER or GO Expansion plan ever. Surely anyone making claims about GO Expansion on a publicly-visible transportation discussion forum has done enough research on it to know at least vaguely what it entails.

Here is the current business case, which took me literally ten seconds to find - far less time than took you to write all those posts.
https://assets.metrolinx.com/image/upload/v1667497052/Images/Metrolinx/GO_Expansion_FBC.pdf
After re-acquainting myself with the FBC, I was surprised to see that it specifically referenced "4-car UPxpress and GO trains" (current UPX are 3 cars, sometimes 2). Makes me think we'll get new matching rolling stock for UPX (albeit different livery I would think). It also shows the hourly trains coming from Kitchener stopping at Weston (and bypassing Malton, Etobicoke North, Mount Dennis and Bloor). Presumably that's so there's less back-tracking if they want to go the airport, but if its what they do, it would suggest we might not lose the UPX stop in Weston in the future after all. In all, Weston would then have 11 trains per hour (4 UPX, 6 Bramalea, 1 Kitchener) which is pretty crazy frequency compared to today.
 
This article seems to cast some more doubt on a new GO Station. https://www.insauga.com/is-mississauga-getting-a-new-go-train-station/

Key bit brought forward:

1723294462555.png


***

I doubt the MPP just made this up.......... I strongly suspect the decision has been made, but again, he got out in front of what might have been a pre--election goodie....

The Premier's office is doubtless thrilled. LOL
 
After re-acquainting myself with the FBC, I was surprised to see that it specifically referenced "4-car UPxpress and GO trains" (current UPX are 3 cars, sometimes 2). Makes me think we'll get new matching rolling stock for UPX (albeit different livery I would think). It also shows the hourly trains coming from Kitchener stopping at Weston (and bypassing Malton, Etobicoke North, Mount Dennis and Bloor). Presumably that's so there's less back-tracking if they want to go the airport, but if its what they do, it would suggest we might not lose the UPX stop in Weston in the future after all. In all, Weston would then have 11 trains per hour (4 UPX, 6 Bramalea, 1 Kitchener) which is pretty crazy frequency compared to today.
The FBC was used to get approval for the GO Expansion On-Corridor RfP.

The team that's been awarded that work proposed not deploying EMUs but reusing the existing GO 2-deck rail cars in smaller consists and with electric locomotives to achieve similar benefits. They should now have completed their 2-year joint development effort with Metrolinx and we *may* be told about the firm plans later this year (once approved by the Premier's Office).
 
Key bit brought forward:

View attachment 587334

***

I doubt the MPP just made this up.......... I strongly suspect the decision has been made, but again, he got out in front of what might have been a pre--election goodie....

The Premier's office is doubtless thrilled. LOL
Or the MPP misspoke and by "new" station, he was referring to the completely renovated Long branch station.
 
Or the MPP misspoke and by "new" station, he was referring to the completely renovated Long branch station.

I presumed he intended to talk about about the Lakeshore BRT stations at that development which is funded and has a completed EA; it's primary job is to connect numerous Lakeshore developments to the Long Branch GO station and Hurontario LRT as an extension of the previously completed "Lakeshore Complete Street Study".

They started land expropriations. Construction coming soon.

It also wouldn't be the first time an MPP didn't know the details of municipal level work in their district. It's entirely possible staff told them transit was funded and they jumped to the conclusion of a new GO station; or they simply lost track of their statement while speaking "steps from a BRT linking to a GO station" becomes "steps from a GO station" pretty easily.

20210818_LTS_Study-Area-Map_Full-Corridor.png


 
Last edited:
I absolutely hate the new Simplii Financial ads that the GO Train Ambassadors are forced to announce. This is a slippery slope that will lead to more ads over the speaker, including pre-recorded ads.
 
I absolutely hate the new Simplii Financial ads that the GO Train Ambassadors are forced to announce. This is a slippery slope that will lead to more ads over the speaker, including pre-recorded ads.

I heard one last week for the Boots and Hearts country music festival. I thought to myself, isn’t that in Oro-Medonte? How is anyone supposed to take GO there?
 
GO to Allandale, then it's just a "little bit" of a walk 😁

Definitely get your exercise in.......

I just took a very crude measurement out of curiosity.

At average walking speed........about a 5.5 hour walk:

1723475710932.png
 

Back
Top