Definitely related to electrification. I confirmed with a Metrolinx employee a few weeks ago. It’s not just appleby, it’s at every station along Lakeshore West.Not too interesting, but they have been surveying all the utilities at Appleby GO. Not sure if this is related to eventually station improvements, electrification, or for investigation work related to eventual level boarding.
View attachment 594394View attachment 594395View attachment 594396
West Harbour pocket track upcoming work update from MX here.
That's the first I've seen confirming the length of the pocket track - basically just long enough to store an extra GO train past the platforms if needed, by the looks of it.
That's the first I've seen confirming the length of the pocket track - basically just long enough to store an extra GO train past the platforms if needed, by the looks of it.
Great to see. I was at West Harbour last Saturday and was disappointed to see no signs of construction. Took these photos while I was there.Let me bring that forward for everyone:
View attachment 597081
View attachment 597082
View attachment 597083


There were trucks on site yesterday (although no "construction") so it seems the September 17 start date was accurate.Great to see. I was at West Harbour last Saturday and was disappointed to see no signs of construction. Took these photos while I was there.
View attachment 597110View attachment 597111
... why are they raising the tracks by 5"?Let me bring that forward for everyone:
View attachment 597081
View attachment 597082
View attachment 597083
... why are they raising the tracks by 5"?




