News   Nov 22, 2024
 654     1 
News   Nov 22, 2024
 1.1K     5 
News   Nov 22, 2024
 3.1K     8 

Danforth Line 2 Scarborough Subway Extension

Halton has a tendency to make their display pieces operational.

This happened with the Gloucester car.

That may prove a little more difficult with the SRT cars - unless HCRR intends to construct a LIM propulsion roadbed. But certainly they could be powered up and made occupiable. Or towed somehow (Large Witts certainly pulled trailers LOL).

Never say never.

- Paul
 
Since they wouldn't run anymore, there shouldn't be as much of a need to harvest every spare part, no?
Better to have the parts and not need them, than to need them and not have them.

Especially when it comes to cosmetic parts. PCC 4000 is kept under lock and key because they're afraid a vandal would steal parts from it there was free access given to it.
 

Back
Top