BurlOak
Senior Member
It has everything to do with it. The only reason the RT is now a subway is because the idiotic Sheppard LRT was cancelled by Ford who wanted to build a subway on Sheppard. There was minimal support to save the second rate LRT line within Scarborough. The subway didn't pan out as Ford wanted but to save his "subway, subway, subway" slogan the opportunistic Stintz, Glenn DB & others drew up the RT replacement.
The other main reason we have the "Scarborough Subway" is because the continuous Eglinton-Scarborough subway was scrapped. A continuous LRT could have cost as low as a few hundred million extra over the on street LRT plan. But when politicians realized that Scarborough was left wanting, it spawned the spending of an extra $2B on the B-D subway extension and also the SmartTrack plan - which will add several Billions in costs near Mount Dennis. Collectively, we decided it is better to save a few hundred million in 2014 and spend an extra $5B later this decade.