It been many months since I last looked at Weston and Mount Dennis stations, but there was only a short section to the south of the Weston station to have 4 tracks in place from the Islington Interlocking to Black Creek interlocking. I thought it would be done now, but the Mount Denise station still need work on it.For me the biggest frustration on the Kitchener line is the lack of movement on the west half of the Guelph siding. Breslau is complete, Acton sounds like it's going to be underway shortly (and it seems pretty simple given that there was already a siding there before), so the Guelph siding is the last piece of the puzzle that is needed to enable at least 1 counter-peak trip to Kitchener, and hourly service between Kitchener and Guelph. Yet even though the Guelph second platform is complete and the east end of the second track is connected to the mainline, there does not seem to be any movement on connecting the west end of the second track to the mainline to enable trains to actually use the new platform they just built.
Weston has always been a bit of a mystery to me, since it was always possible to run 30-minute service on the tracks we already had. Weston is a fairly short passing segment so it does make more sense to just keep using the corridor as a single 3-track line rather than a 2-track line plus a 1-track line with a passing siding at Weston. If the 4th track were extended south through Mount Dennis (whose 4th platform is nearing completion anyway) the passing location would be a lot more reliable, but there doesn't seem to be any interlocking immediately south of Mount Dennis where they could tie the 4th track back in. So then they'd either need to add a new interlocking or just wait until they can get the 4th track all the way down to Bloor, and I suspect they do the latter and just wait.
.
Forgot to check the west end in Guelph when I was up there a few weeks ago, but I thought they had cut in the west switch. The east has been cut end with working track signals. If the west not cut in, this means the south track will be used for trains ending at Guelph when it should be Kitchener.