Leo_Chan
Senior Member
Ok, I’ll be looking forward to the 1000m long trains coming to Highway 7.There were also issues like the bridges at Hurdman and Bayview being in much worse condition then expected due to 30 years of salt corrosion. I don't mean it was terrible, but the intention 30 years ago was that the transitway was pretty much a lay rail and your done idea. The platforms seemed long enough at the time. Those assumptions turned out wrong decades later, and if the Viva rapidways get converted on a similar 30 year later thing they'll find that it's less convertible than thought too. Seattle also found that out with their downtown tunnel which had rail installed in the 80s but had to be all redone when they actually introduced the link Lrt