mdrejhon
Senior Member
Source?And even then it will still only exit to outside.
I thought it was going to connect it to the rest of PATH via the HSBC building.
Source?And even then it will still only exit to outside.
It wouldn't connect to the path on the NW corner of Wellington and York under the HSBC building?
EDIT....I can't even picture where at York and Wellington it would be able to have an outdoor exit/entrance.
Yes, #2 clearly brings the PATH to a new area (or better connects an old one.) I assume the tunnel would be a condition for approving 160 Front. Of course, bringing it under Front to the Convention Centre is another needed project.One of 1, 3 & 4 should be built - and 2 should be built as part of when 160 front west (is that the right one?) is built. Also... is that simcoe tunnel actually already built ?
In my opinion all 4 achieve different things but I think the City are looking at only one, at least for the moment.I’d build one and two. They accomplish different connections.
In my opinion all 4 achieve different things but I think the City are looking at only one, at least for the moment.