Does it really take them a full month to install a rail on a ceiling. Only in Toronto.
You should be bidding on these things.
Also, watch for asbestos as we put that stuff everywhere in the 70's.
Last edited:
Does it really take them a full month to install a rail on a ceiling. Only in Toronto.
You should be bidding on these things.
Also, watch for asbestos as we put that stuff everywhere in the 70's.
But still, a month??
He does actually bring a valid point. Im not sure how they scheduled this but in 1 month they can form at least 3 floors for a condo. Apart from the asbestos (is there any???), there really shouldnt be that much complex workOn which planet, earthling?
They also spent the whole summer with busitution after 10pm so they can upgrade the overheads. I'm pretty sure most 512 riders are fed up on how slowly this project is progressing and being told to walk 5 minutes to transfer from streetcar to the subway.You should be bidding on these things.
Also, watch for asbestos as we put that stuff everywhere in the 70's.
Drum had some better close-up pics at https://urbantoronto.ca/forum/threa...ars-testing-delivery-bombardier.3263/page-872I got some pictures of the overhead work at St. Clair West station. As of now, there is no longer any streetcar wires in the station it has all been replaced by a rigid overhead that looks similar in size to the power rails for the SRT.
When someone opens the gate?Wonder when the first Kingston car(s) will be released.
4506 ready to ship. Wonder when the first Kingston car(s) will be released.