tsm1072
Active Member
Sheppard and McCowan makes a lot of sense as the terminus point for lines, plenty of space to build a station that allows very efficient transfer between multiple lines and modes. You can also build a nice large maintenance and storage yard on all that land in the CP yard that isn't being used by CP. Also, if you want to plan for the very long term (50+ years). This location will allow transfers to trains to/from Peterborough (maybe even Ottawa and Montreal), a GO midtown line, as well as potential GO trains on the CP line through Northern Pickering and central Oshawa.Yep. So much more logical to have the major transit interchange (BD+Line 4+LRT) in Scarborough be here:
View attachment 305132
And not here:
View attachment 305133
We will never look back on this decision and wonder what the hell we were thinking. /s
These things may not happen, but allowing for it will save money and time in the future. The Line 2 Kipling and Kennedy extensions will start to reap the benefits of terminating on a rail corridor in 5-10 years, about 50 years after they were built.