Toronto Yonge Sheppard Centre Renovations and Expansion | 123.13m | 35s | RioCan | BDP Quadrangle

Great sunrise yesterday. Unfortunately not really reflected here.

IMG_5404.JPG
IMG_5405.JPG
 
Was at Longo’s yesterday and was able to take a look into the Cactus Club space from the checkout area. I’m not entirely sure what is going on but there’s no signs of construction and the space is still empty.
A smaller Cactus Club is coming,.... less seating & lower occupancy load,.... with pre-fab patio unit
 
Cactus Club has been aiming for opening on August 20,…. looks very likely.

At first, I thought I found Big Bird and his wife!
61D76163-43C3-4607-8E86-CE4871E3E11E.jpeg


F88286BD-91BA-476F-B282-5E7337389FDC.jpeg


8154A3E6-4632-4DDF-B335-70A80CFF85DB.jpeg


0B76ABEE-37FD-4E4A-862F-210D317B7EB8.jpeg


73CB3097-8245-45E9-BCA5-436F7EC4F971.jpeg
 
14,,000sqft Cactus Club with capacity for 350 will have Grand Opening on Tuesday August 20 - confirmed

1723568627746.png


1723568694015.png


1723568775207.png


1723568882175.png

Photo source: Cactus Club
 

Back
Top