Toronto YC Condos -- Yonge at College | 198.42m | 62s | Canderel | Graziani + Corazza

Last Friday:
20180824_165416.jpg
20180824_165418.jpg
 

Attachments

  • 20180824_165416.jpg
    20180824_165416.jpg
    490 KB · Views: 584
  • 20180824_165418.jpg
    20180824_165418.jpg
    398.8 KB · Views: 599
This is easily one of the worst looking towers to come out of this boom. The podium, the balconies, and the crown - all atrocious.
 
Should forward this thread to the developer and the architect. Would love to hear them explain away this garbage.
 
We warned you. Got to love this BILD project of the year.

AoD

Dead Right.


On Mar 1, 2012 I posted on this thread:

"As many of us know, this company is congenitally incapable of creating quality buildings. Words like innovative, interesting, intelligent, and thoughtful, are not in their vocabulary. Hacks they are, and hacks they shall remain.

No matter what the "size worshipers" on this site may believe, for those of us who care about architecture, it remains a serious drag that a city as important as Toronto is stuck having to deal with the tacky ambitions of a design-build company on steroids, intent on permanently marring our skyline with their horrid vertical cow-patties."

And here we are, 6.5 years later.

https://urbantoronto.ca/forum/threa...m-62s-canderel-graziani-corazza.17645/page-20
 

Back
Top