Toronto Y&S Condos | 130.77m | 38s | Tribute | Graziani + Corazza

Is there a rental component here?

1711637053041.png
 
Something I learned from talking on the sky Tower thread is luffing cranes are much slower than a hammerhead so could have been due to site constraints they needed to use that crane till they reached the podium and could switch to a hammerhead
Correct. Site constraints until they could clear the adjacent Quantum podium.
 

Back
Top