Toronto Y&S Condos | 130.77m | 38s | Tribute | Graziani + Corazza

Taken 10-27-2023

20231027_134959.jpg


20231027_135038.jpg


 
At some point, @Art Tsai will report on the changes proposed here.............. ;)

The proponent would like to change a chunk of the office space to live/work.


The total unit changed from 335 units to 380 units. The total bike parking changed from 445 bike parking to 482 bike parking.
 
At some point, @Art Tsai will report on the changes proposed here.............. ;)

The proponent would like to change a chunk of the office space to live/work.

Basically, they want to switch the the portions of each office floor to live work units for the areas that face Yonge and Soudan, about 800 sq m worth of each floor, while another 800 sq m in the northeast corner of each podium floor would remain as standard office space.

42
 
The total unit changed from 335 units to 380 units. The total bike parking changed from 445 bike parking to 482 bike parking.
Don't know why more of these changes (from office use to whatever) are not being proposed for sites that previously had office buildings. With office attendance back to only slightly more than 50% of pre pandemic levels and unlikely to get significantly better, especially for anything below Class A office space with enticing amenities, the city should be encouraging and fast tracking rezoning for many of these Class B and lower office buildings.
 

Back
Top