Who doesn't love an argument which is based on terms too broad to justify.
This is on my list of favorates too, but let's wait to see some materials before we get too emotional over this building.
The sales agent told me this building would be ready in 1 year. I have a hard time believing that. I'd say 2 years.
^what height was the minor variance for? On that note, what is the current height supposed to be for this one? I always assumed it was in the same range as say casa for example.
1 meter on the total height, a couple of hairs shorter than Casa at 138.1 meters.
From the COMMITTEE OF ADJUSTMENT
15. 590 JARVIS ST
File Number: A0255/09TEY Zoning CR T4.0 C1.0 R4.0 (PPR)
Owner(s): GREAT GULF (JARVISCHARLE
[
Ward: Toronto Centre-Rosedale
(27)
Agent: GREAT GULF (JARVISCHARLE
Property Address: 590 JARVIS ST Community:
Legal Description: << STRUCTURE ADDRESS FOR 110 CHARLES ST E
PURPOSE OF THE APPLICATION:
To increase the height of the proposed 44-storey residential building.
REQUESTED VARIANCE(S) TO THE ZONING BY-LAW:
Section 1.(d), By-law 1018-2005
The maximum permitted height of the building is 129.0 m to the top of the main roof including the
parapet wall, and a maximum height of 137.0 m to the top of the mechanical penthouse.
In this case, the proposed height of the building is 130.93 m to the top of the main roof, and 137.99 m to
the top of the mechanical penthouse.
Good find.
Yes, the 400' list shows Casa at 453 feet & X at 451 feet including the height variance for X.