Marcanadian Moderator Member Bio Joined Jul 30, 2007 Messages 4,010 Reaction score 11,290 May 22, 2017 #1,966 Saturday: Teahouse by Marcus Mitanis, on Flickr
Lenser Senior Member Member Bio Joined Dec 7, 2011 Messages 3,368 Reaction score 4,623 Location Leslieville May 27, 2017 #1,967 Some photos from yesterday. That exposed subway tunnel is fascinating. Attachments TeahousePit-May26-17A.png 1.6 MB · Views: 396 TeahousePit-May26-17B.png 2 MB · Views: 432 TeahousePit-May26-17C.png 1.9 MB · Views: 402
stjames2queenwest Senior Member Member Bio Joined Sep 9, 2014 Messages 2,971 Reaction score 4,043 Jun 2, 2017 #1,968 Yesterday evening (June 1)
AlvinofDiaspar Moderator Member Bio Joined Apr 22, 2007 Messages 33,519 Reaction score 29,522 Location Toronto Jun 2, 2017 #1,969 Some of those rebars look a lot thicker than usual. AoD
AlvinofDiaspar Moderator Member Bio Joined Apr 22, 2007 Messages 33,519 Reaction score 29,522 Location Toronto Jun 15, 2017 #1,970 Massive concrete pour this morning: AoD Attachments upload_2017-6-15_9-0-51.jpeg 128.9 KB · Views: 451
P ptbotrmpfn Senior Member Member Bio Joined Jan 29, 2011 Messages 1,339 Reaction score 386 Jun 15, 2017 #1,971 So having looked at the renderings linked at the top of the page.... what is the final look of that smaller building? The roof looks different in every image. And is either a curved look or will just set back
So having looked at the renderings linked at the top of the page.... what is the final look of that smaller building? The roof looks different in every image. And is either a curved look or will just set back
innsertnamehere Superstar Member Bio Joined Mar 8, 2010 Messages 19,800 Reaction score 24,126 Jun 15, 2017 #1,972 curved.
Benito Senior Member Member Bio Joined Mar 12, 2014 Messages 7,875 Reaction score 53,321 Location Yonge and Bloor Jun 17, 2017 #1,973 Today. Attachments IMG_5400.JPG 1.1 MB · Views: 378 IMG_5401.JPG 1.4 MB · Views: 356 IMG_5402.JPG 1.4 MB · Views: 348 IMG_5403.JPG 1.5 MB · Views: 405 IMG_5404.JPG 1.4 MB · Views: 367
Geekaroo Active Member Member Bio Joined Apr 30, 2007 Messages 393 Reaction score 281 Location Downtown TO Jun 21, 2017 #1,974 It's That Time!!! Attachments 20170621_070651.jpg 246.2 KB · Views: 341
Benito Senior Member Member Bio Joined Mar 12, 2014 Messages 7,875 Reaction score 53,321 Location Yonge and Bloor Jun 21, 2017 #1,975 Crane is up. Attachments IMG_5496.JPG 934.2 KB · Views: 409
Geekaroo Active Member Member Bio Joined Apr 30, 2007 Messages 393 Reaction score 281 Location Downtown TO Jun 21, 2017 #1,976 Attachments 20170621_174751-1305x734.jpg 265.1 KB · Views: 326
ChesterCopperpot Senior Member Member Bio Joined Jul 4, 2012 Messages 4,274 Reaction score 7,655 Location Toronto Jul 5, 2017 #1,977 A serious amount of rebar in the walls above the tunnel
AlvinofDiaspar Moderator Member Bio Joined Apr 22, 2007 Messages 33,519 Reaction score 29,522 Location Toronto Jul 5, 2017 #1,978 ChesterCopperpot said: A serious amount of rebar in the walls above the tunnel Click to expand... They are basically building a bridge atop the existing tunnel - you can literally see how it floats at the Yonge and Grosvenor corner right now. AoD
ChesterCopperpot said: A serious amount of rebar in the walls above the tunnel Click to expand... They are basically building a bridge atop the existing tunnel - you can literally see how it floats at the Yonge and Grosvenor corner right now. AoD
ahmedyusali Member Member Bio Joined Mar 3, 2008 Messages 341 Reaction score 81 Location Toronto/Mogadishu Jul 6, 2017 #1,979 is this building has a park lot ? or will they use free spots on Wellesley on the Park,building since the developer is the same company ..
is this building has a park lot ? or will they use free spots on Wellesley on the Park,building since the developer is the same company ..
ChesterCopperpot Senior Member Member Bio Joined Jul 4, 2012 Messages 4,274 Reaction score 7,655 Location Toronto Jul 6, 2017 #1,980 The parking is above grade. On levels 2,3 and 4.