Toronto Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

Sept 3
Not all of the bridge is in place as there is more to go in at the west end. The bridge will be anchor/tie into the ground floor of both buildings as the re-bar ties are waiting for the floor now.
21235268141_bf3197fc21_b.jpg

21201085926_36cfb12d31_b.jpg

20606213483_288bab87c7_b.jpg

20606218953_d3a60e21df_b.jpg

21040531689_877cd4244d_b.jpg

21040577239_cc93087d41_b.jpg

21039308090_3df8c1642e_b.jpg
 
There's a crane coming soon.

IMG_6731.JPG
IMG_6732.JPG
 

Attachments

  • IMG_6731.JPG
    IMG_6731.JPG
    504.1 KB · Views: 1,668
  • IMG_6732.JPG
    IMG_6732.JPG
    631.4 KB · Views: 1,666
Moving forward slowly.

IMG_7365.JPG
IMG_7367.JPG
 

Attachments

  • IMG_7365.JPG
    IMG_7365.JPG
    334.7 KB · Views: 912
  • IMG_7367.JPG
    IMG_7367.JPG
    361.4 KB · Views: 744

Back
Top