Everything had to be redesigned for the development of the condo instead of the original hotel that was approved. Although the building envelope stayed the same as the hotel, only the first two levels will be kept from the hotel design. From the second floor up the entire building's structural and mechanical is different as the condo structure is not the same as the hotel structure and necessitated the construction of a massive transfer slab on the second level.. Purchasers were notified about the tentative occupancy.

Because of the extensive changes, new applications had to be submitted for rezoning and building. There are still more submissions of drawings that have to be made to the City of Toronto to complete the application process.

Yes, the sales were fast but no one should be under the mistaken impression that this was merely starting where one project left off.
 
Appreciate the update. Thanks.

RM
 
from Daily Commercial News.....

CONDOMINIUM BUILDING Proj: 9110621-2

Toronto, Metro Toronto Reg ON NEGOTIATED/START
Rêve Condominium, 560 Front St, Portland Ave, M5V 1C1
$45,000,000 est

Start: April, 2010 Complete: October, 2011

Note: Gen Cont will award Sub trades sequentially through Summer, 2010 by invitation. All trades are expected to be in place June/July, 2010. Further update at that time.
Providence Energy Management Ltd is the LEED Consultant for the project.

Project: concrete foundation, concrete tilt-up structural frame, fuel fired heating system, environmentally friendly construction materials; low-volatile organic compound paints; construction of a 305 unit condominium building. The building will be 15-storeys in the front, and will step back to 9-storeys with rooftop garden terraces. Units will range in size from 490 to 1,455 sq ft. Amenities will include; 24-hour concierge service; a party lounge; meeting rooms; billiards room; theatre; yoga centre; sauna area; wellness centre and rooftop terraces; The project will aim to achieve LEED standards.

Scope: 405,000 square feet; 15 storeys; 2 storeys below grade; 305 units; parking for 400 cars; 4 acres
Development: New
Category: Apartment bldgs; Retail, wholesale services
 
April 14
The #2 crane is up with saw cutting taking place. That foundation they pour for the new fencing is been remove.
 
Last edited:
Recent pics

2nd crane

4549640450_255beb1c52_b.jpg



4549004865_0ea08631f7_b.jpg



4549005545_7ce2958849_b.jpg



4549007721_bdbf467de3_b.jpg



4549643264_5ec54ebb11_b.jpg



4549642828_ca340b96ac_b.jpg



4549642252_9e57845247_b.jpg
 
Excerpt sent out to Tridel's Reve purchasers: Reve construction begins: "..we have received Formal Zoning Approval as of May 19, 2010. Now that zoning is in place we have acquired the Building Permit which allows us to officially start construction for your community."
 
This must be a record. I've never seen a building go up so fast. When they're done (next week?) they should send this crew over to the Charlie.
 