If you look at the last photo in posting 131, that is not what there on Friday.

They are doing the steel caisson along the east side now. Saw no sign of the first one and why the change? Could be it was put on the wrong side by mistake as noted in the above photo.
 
Pic taken Oct 25, 2011


T8WJM.jpg
 
Pics taken Jan 16, 2012

Qwcw5.jpg



ju3dC.jpg



os7WI.jpg
 
Pic taken Feb 15, 2012


QmM6t.jpg
 
Pic taken Mar 14, 2012


uzpLm.jpg
 
Pics taken April 11, 2012

f5N80.jpg



vJ1bJ.jpg
 
Last edited:
Looks like the first crane for the Quartz / Spectra site was installed today.
 
Great shot/update Jasonzed.
Thanks
 