November 4 - Backfilling of the area where the foundations and basements of the Front Street buildings were demolished and removed, to provide a stable, flat base for the shoring rig - already on site
20201104_124107.jpg
.
 
Ongoing site preparation activities at Portland Commons - the Bobcat is moving earth from the work being done by the building over to the excavated area for backfill, and the crane by the building is continuing the preparation for the Hydro duct and the underground connection between the new and already existing buildings.

The main shoring activities are due to start the week of November 15.

20201106_124747.jpg
 
Lots of site preparation work going on. Equipment on site includes:

  • One Shoring Rig
  • One Excavator
  • One Hydrovac excavator
  • Two Bobcats
  • One Bulldozer
  • One Roller
  • One Backhoe
First photo - overview of the site. Second photo, more back fill being delivered. Third photo - the roller is compacting the backfill for a stable, level base for the shoring machine.


20201111_125254.jpg


20201111_125921.jpg


20201111_125728.jpg
 
Ground Breaking -
Jim Tadeson, Founding Partner, Carttera, Dean Cutting, Partner, Carttera
Middle Row: Heidi Tibben, Vice President, Carttera, Alan MacKenzie, CEO, JLL Canada
Jon Pezim, Executive Vice President, JLL Canada
Back Row: Michael Case, Executive Vice President, JLL Canada,
1C2A5811.jpg

Oliver Alves, Executive Vice President, JLL Canada
 
For a second I was hoping it was a dance crew video. That would easily make it the best groundbreaking ever, not that the bar has been set high.
 
Shoring work is proceeding quickly now - the pile of earth removed from the shoring columns is now quite impressive. Normally the ground excavated from the shoring columns is trucked away on a progressive basis - but for now it seems to be just accumulating at the south end of the site.

20201125_130451.jpg
 