drum118
Superstar
April 03
All the rails and ties pull on the northside of the Lake Shore.
Not sure how much further west where the new retaining wall will go compare to where the 2nd steel bridge sat the was further west of the rail bridge.
All the dirt under the Commissioner St bridge have bee removed that you can see the footings for all the pier support as well the ends now.
When did the South Cherry St get place as they are pouring concrete road for the north end. No idea if the south end been pour as well the rest, but black protection on end sections.
A new lane has been pave and strip as one lane on the north side of Polson Pier.
The area at Polson Pier Rd has been trim drown to a few feet different between all existing roads.
Going out on the limb and on the line I thought would happen last year, I don't seeing the New Cherry St opening in Aug as plan.
We still have a shipping day as to when the North Cherry St Bridge to be ship as well another 7-8 days shipping time and a day to place it. Will the bridge be place on the bearing or support first and then lower into place?? Then there is the pouring of the bridge deck, paving of the new road as well having the new Lake Shore/Cherry St built.
Photos to follow sometime this week
All the rails and ties pull on the northside of the Lake Shore.
Not sure how much further west where the new retaining wall will go compare to where the 2nd steel bridge sat the was further west of the rail bridge.
All the dirt under the Commissioner St bridge have bee removed that you can see the footings for all the pier support as well the ends now.
When did the South Cherry St get place as they are pouring concrete road for the north end. No idea if the south end been pour as well the rest, but black protection on end sections.
A new lane has been pave and strip as one lane on the north side of Polson Pier.
The area at Polson Pier Rd has been trim drown to a few feet different between all existing roads.
Going out on the limb and on the line I thought would happen last year, I don't seeing the New Cherry St opening in Aug as plan.
We still have a shipping day as to when the North Cherry St Bridge to be ship as well another 7-8 days shipping time and a day to place it. Will the bridge be place on the bearing or support first and then lower into place?? Then there is the pouring of the bridge deck, paving of the new road as well having the new Lake Shore/Cherry St built.
Photos to follow sometime this week