AlvinofDiaspar
Moderator
Have they published any final designs of the bridges?
This is the closest to final I can locate:
AoD
Have they published any final designs of the bridges?
Are they saying that the funded phase of the project includes building both the transit bridge and the ped/bike/car bridge at Cherry, and the other two ped/bike/car bridges (Cherry South and Commissioners) but not the accompanying transit bridges in those two cases?
great shot!Cirque du Gardiner. Lower Don Lands redevelopment, including the Gardiner Expressway East rehabilitation. Shot taken from our balcony in Toronto's Distillery District this evening. The triangular shaped Storm Water Quality Facility (under construction) can be seen on the right. The massive white tents are used for storage of the expressway components, tools and equipment.
View attachment 260779
I couldn't find a sub-forum for this, but does anyone have any info on the status of this project? It looks amazing.
Lake Ontario Park
You have not been paying attention! The dirt is all being cleaned and will be put back onto the new park area. (WT has a large soil-cleaning plant on Unwin Street) You can see HUGE piles of clean dirt on south side of lake Shore Blvd at the Don Roadway.If the dirt is "clean", hopefully they can add it to the Toronto Islands.
You have not been paying attention! The dirt is all being cleaned and will be put back onto the new park area. (WT has a large soil-cleaning plant on Unwin Street) You can see HUGE piles of clean dirt on south side of lake Shore Blvd at the Don Roadway.
So there!You have not been paying attention! The dirt is all being cleaned and will be put back onto the new park area. (WT has a large soil-cleaning plant on Unwin Street) You can see HUGE piles of clean dirt on south side of lake Shore Blvd at the Don Roadway.