It seems to be much to far from where the tower will rise to be an external tower crane. Perhaps it will be used to unload materials from Yonge Street onto the plaza/work site, as was the case with the Ritz. Or perhaps the crane will be relocated later on in construction, as was the case with the Four Seasons.
Yeah I thought of this but, the curve of the tower will be quite a distance from the base as it rises and it is the only place possible for an external crane, as there is no room on the other three sides.
Something like this... Sorry for the quick and crude render.
It was just speculation on my part.