mdrejhon
Senior Member
The A-Line spur was only from King through waterfront, which was not a very effective spur. To really make A-Line worth it, Mohawk College at the least needs to be connected. And if you're getting up there anyway to Mohawk, you might as well go a couple stops down and reach Limeridge Mall. It is probably not worth building A-Line until you have at least two or three major mountain stops (minimum)
Incidentally, the distance between B-Line LRT station and the Hunter GO station is only ~320 meters -- the length of a GO train -- not too dissimilar from the walk between Union TTC and a Union GO platform.
This is being pedestrianized. In addition, also included in the LRT funding, is 28 kilometers of Braille sidewalks (the grey edges) for the whole LRT corridor.
Ultimately, I consider it "connected". A bit of a stretch but adequate considering the circumstances set forth.
Incidentally, the distance between B-Line LRT station and the Hunter GO station is only ~320 meters -- the length of a GO train -- not too dissimilar from the walk between Union TTC and a Union GO platform.
This is being pedestrianized. In addition, also included in the LRT funding, is 28 kilometers of Braille sidewalks (the grey edges) for the whole LRT corridor.
Ultimately, I consider it "connected". A bit of a stretch but adequate considering the circumstances set forth.