drum118
Superstar
July 28
Totally piss off after finding out both batteries, including the spares for my Canon camera were dead after I get to the site and had to use the Sony that not great shooting night shots. Even the videos were poor and more do to the flood lights. Not the best shot. Took less than 1 hour to have the bridge in place by 1:55 am. Someone was using a dome to take aerial shots connected to the project.
Crane is to be dismantle ASP, as it is going elsewhere. No one is sure if the next bridge will be place in Aug as plan at this time, as well when. As it stands, no photos off site can be taken for that move, as the south side is fence off now.
Totally piss off after finding out both batteries, including the spares for my Canon camera were dead after I get to the site and had to use the Sony that not great shooting night shots. Even the videos were poor and more do to the flood lights. Not the best shot. Took less than 1 hour to have the bridge in place by 1:55 am. Someone was using a dome to take aerial shots connected to the project.
Crane is to be dismantle ASP, as it is going elsewhere. No one is sure if the next bridge will be place in Aug as plan at this time, as well when. As it stands, no photos off site can be taken for that move, as the south side is fence off now.