I know for a fact that Mississauga cars will have all the issues fix that Ottawa cars have before they arrive. The first car was to arrive by year end, but no OS in place at the complex and the test line will not be completed until Q2 2024 at this time. Expect to see the delivery delay since the line will not open as plan by 6-12 monthsHold on a second here.
The issues with Ottawa stem from the trucks and the ways that they interface with their track geometry, especially at the speeds asked of them.
There is absolutely, positively, NO indication as yet that either Finch West or Hurontario will share those same issues, seeing as how those lines are predominantly straight, and will operate at far lower speeds.
Dan
I have yet to see a Finch car in testing and the track system is different from Crosstown and Mississauga.
ML has concerns what taking place in Ottawa for their cars regardless of speed and they will want the same changes as Ottawa cars to their cars. Both ML and the contractor have stated what every issues Ottawa cars have will be fix before been delivery for Mississauga.