drum118
Superstar
July 1st
End up shooting more areas than I have in the past and some of the info will be under their own threads.
Haven't really miss much since my last visit, but started east from Don Mills to Kennedy and then back.
Most of the rail stills needs to be install east of DVP to Victoria Park. They are forming platforms for Victoria Park Stop. They have removed the concrete barriers from VP station to Pharmacy, with pillions taking over.
Just west of Victoria Park to Birchmount, overhead wire supports have been installed on all the columns. Overhead wire in place at the crossover east of Pharmacy, but not 100% install. Westbound platform and shelter in place for Hakimi Lebovic Stop. Birchmount are just started to be work on. Seen 2 stops with platforms in both direction and one of 2 for another so far.
All the track in place from VP just before Birchmount and work is taking place under tent to take them to the portal at Kennedy Rd.
Curbs are being installed on the north side of Eglinton with only one access to the whole plaza or a business. Starting to see the coming of a 2 lane road in place of 3 lanes, with a small area seeing new sidewalk.
All the back filling over the tunnel at Kennedy Rd done, as well pass the traffic light to the east. The east side still needs the road pour. No left turn at Kennedy going east at this time.
A fair number of intersection have new traffic signals wrap up and waiting for them to be activated and the removal of the construction ones. This is for all directions including the LRT ones.
Photos to follow in the next few days.
All the surface rails will be in place by fall and overhead by spring 2021 to allow testing once LRV's can pass through the tunnels and stations.
End up shooting more areas than I have in the past and some of the info will be under their own threads.
Haven't really miss much since my last visit, but started east from Don Mills to Kennedy and then back.
Most of the rail stills needs to be install east of DVP to Victoria Park. They are forming platforms for Victoria Park Stop. They have removed the concrete barriers from VP station to Pharmacy, with pillions taking over.
Just west of Victoria Park to Birchmount, overhead wire supports have been installed on all the columns. Overhead wire in place at the crossover east of Pharmacy, but not 100% install. Westbound platform and shelter in place for Hakimi Lebovic Stop. Birchmount are just started to be work on. Seen 2 stops with platforms in both direction and one of 2 for another so far.
All the track in place from VP just before Birchmount and work is taking place under tent to take them to the portal at Kennedy Rd.
Curbs are being installed on the north side of Eglinton with only one access to the whole plaza or a business. Starting to see the coming of a 2 lane road in place of 3 lanes, with a small area seeing new sidewalk.
All the back filling over the tunnel at Kennedy Rd done, as well pass the traffic light to the east. The east side still needs the road pour. No left turn at Kennedy going east at this time.
A fair number of intersection have new traffic signals wrap up and waiting for them to be activated and the removal of the construction ones. This is for all directions including the LRT ones.
Photos to follow in the next few days.
All the surface rails will be in place by fall and overhead by spring 2021 to allow testing once LRV's can pass through the tunnels and stations.