NoahB
Active Member
New post about Keelesdale Station
I'm amazed that I can agree with you on one thread and disagree with you so much on another thread. As an Eglinton resident I am perfectly happy with my future LRT. As a former Scarborough resident I resented so many bus routes being routed through STC needlessly.
Maybe but my wife's work is at Eglinton and Kipling and we were perfectly content with an at grade lrt. The one plus of Scarborough deserving grade seperated lines is that Doug said if they're getting grade separated lines then etobicoke is getting grade separated lines too!Hey you're an e l i t e who's getting underground service /s
You're making it seem more inconsequential than it is. I'll put it more simply, let's say if an LRV approached an intersection where there was no signal priority activated. If a light was about to change to red and the LRV was just a couple dozen metres out, the light would change to red and the LRV would be forced to hold for the next green signal. Multiply that over the widely spaced traffic lights, that will get less widely spaced out as the Golden Mile stretch becomes more urbanized, and that results in longer travel times than what you stated above.
And that's just one instance, because the lack of signal priority comes into play in more scenarios than what I illustrated above.
Planners of Transit City and Eglinton LRT had no concept of building a network and made no provisions for a Relief Line.The difference in stop spacing is very consequential. Spadina and St Clair have ~ 200 m between the stops, while Eglinton East will have 500-600 m.
That won't be a major factor though. The traffic lights are very widely spaced along that stretch of Eglinton. Even if the LRT gets no priority at all, the extra travel time will be small.
The stretch in question, Laird to Kennedy, is about 9 km long. Surface LRT running at 23 kph, can cover it in (9*60)/23 = 23 min. At the subway speed of 32 kph, it would be (9*60)/32 = 17 min. The extra running time is about 6 min each way.
Of course, it would be better to extend the exclusive section from Laird to Don Mills. Not so much for speed, more for the capacity management (allowing more frequent service all the way to Don Mills interchange, rather than to low-volume Laird stop).
Ask residents who live along Spadina, Lake Shore Blvd West, and St.Clair for starters what's wrong with streetcar service. They'll give you a nice list of issues.
That shouldn't even be allowed in the first place.In fact, I suspect that the LRT speed through the Golden Mile will be higher initially, perhaps 25-26 kph, and then will drop to ~23 kph as more traffic lights are added.
Planners of Transit City and Eglinton LRT had no concept of building a network and made no provisions for a Relief Line.
It was to scatter $15B to various areas priority neighborhoods to make marginal improvements to their commutes, rather than choosing a solution or two that is more expensive, but makes drastic improvements to the largest number of people.
Well i'm not here to try and convince you otherwise because clearly you're entitled to your own opinion.First of all, hitting each and every intersection just when it turns red will be a very rare misfortune. Let' say for simplicity that the chance of hitting red at each intersection is 1 in 2. Then the chance of hitting 6 reds in a row will be 1 in 64, or less than 2%.
Furthermore, fully grade separated does not equate a completely sterile environment. Signal problems, crew changes, alighting/boarding delays, fire at the track level (or detectors giving alerts even if there is no actual fire); all sort of things happen and cause delays unrelated to surface traffic signals.
If the subways typically clock ~32 kph travel speed, and buses clock ~18 kph, then the estimate of ~23 kph for surface level dedicated-lane LRTs is pretty reasonable. Even in the denser environment, LRTs will have larger stop intervals than buses, and will not be blocked by general traffic while running between the traffic lights. It would be strange if those two factors didn't give LRTs any speed advantage over buses.
In fact, I suspect that the LRT speed through the Golden Mile will be higher initially, perhaps 25-26 kph, and then will drop to ~23 kph as more traffic lights are added.
In summary: yes it is a factor, street-median will be slower than tunnel or guideway, but this is not a factor that totally alters the quality of service. Most of the riders will hardly notice, they will just pad their travel plans by 5-6 min compared to what they could have if the line had a fully exclusive route for its whole length.
In the case of St.Clair, the streetcar service is better than replacement bus service that I can agree on. However, there are still quite a few operational issues that continue to hamper the service to date. The largest of which: lack of active signal priority.As someone who used to live on St. Clair West, while the streetcar service isn't (or wasn't) perfect, it was a hell of a sight better than the replacement bus service.
Dan
That won't be a major factor though. The traffic lights are very widely spaced along that stretch of Eglinton. Even if the LRT gets no priority at all, the extra travel time will be small.
The stretch in question, Laird to Kennedy, is about 9 km long. Surface LRT running at 23 kph, can cover it in (9*60)/23 = 23 min. At the subway speed of 32 kph, it would be (9*60)/32 = 17 min. The extra running time is about 6 min each way.
Of course, it would be better to extend the exclusive section from Laird to Don Mills. Not so much for speed, more for the capacity management (allowing more frequent service all the way to Don Mills interchange, rather than to low-volume Laird stop).