More pictures added by the Crosstown social media accounts. These shots are from Leslie.
You're one of those types....collisions (don't call them accidents).
Wish I had a closer look but Science Centre is making good progress so far!
Hmm here I thought the intersection would have a delayed opening!From Councillor Jaye Robinson:
"I am pleased to announce that the Leslie Street Closure will re-open earlier than the original September 1 end date! I was advised today that the intersection of Leslie at Eglinton will open at 5:00AM on August 21, 2019 with a single eastbound left-turn lane. The dual eastbound left-turn lanes will be available a week later. "
They were pouring concrete for curbs and part of the roadway yesterday, A firetruck didn't have much difficulty getting through.Hmm here I thought the intersection would have a delayed opening!
As in Leslie, to Eglinton?They were pouring concrete for curbs and part of the roadway yesterday, A firetruck didn't have much difficulty getting through.
The stations boxes are all just pre-fabricated steel and glass boxes / the electrical seems to be the the part that will be the most tedious. The mined stations still need a lot of work but the surface portion should be finished by the end of the year
Is there underground access to the Science Centre?
Yes. Those flexi-poles are meant for emergency vehicles to drive over them.As in Leslie, to Eglinton?
I one time did notice a construction vehicle hop over the posts which just flip down.