The elevators not in service had nothing to do with whether it was a government/private build. The South elevators that serviced Levels 1 and 2 of the Bus facility were fully operational and approved through the TSSA. The North elevators that were not in service was not due to the fact at they were inoperable, but in fact were ready, serviced other parts of the building that were not yet complete and ready to be accessed to the public, i.e underground parking. They had to be locked out to ensure the public was not in danger of entering spaces that are still deemed a "construction" area.

Thanks. So in other areas like several go projects and stations, most recently Kipling station. Any idea what common challenges elevators present? Is it the certification process ?
 

innsertnamehere

Superstar
Member Bio
Joined
Mar 8, 2010
Messages
17,673
Reaction score
17,685
Thanks. So in other areas like several go projects and stations, most recently Kipling station. Any idea what common challenges elevators present? Is it the certification process ?
My understanding is that there is a shortage of elevator techs so it may be a problem with getting crews on site. Just guessing though.
 
  • Like
Reactions: DSC

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
16,130
Reaction score
17,923
Location
St Lawrence Market Area
If you do not need to travel you should stay home. The new GO bus terminal will be there for a while.
Just replying to myself to 'confess' that (despite my comment above) I was in the new GO bus station yesterday. I was out walking (socially distanced and masked) with a chum and we walked past and peered in. It was remarkably empty so we went in, saw both levels and took the new bridge and escalators to the SBA. Looked good to us and, as noted by others, a bit airport-like.
 

Student99

Active Member
Member Bio
Joined
May 18, 2008
Messages
587
Reaction score
250
Kind of surprised they went and opened the bus terminal in the midst of the pandemic... wouldn't it be safer to be waiting in open air than inside of a building? Metrolinx could have delayed the switch I'm sure. Perhaps costly, but you know what, better safe than sorry
 

UtakataNoAnnex

Senior Member
Member Bio
Joined
Mar 5, 2020
Messages
4,550
Reaction score
6,481
Kind of surprised they went and opened the bus terminal in the midst of the pandemic... wouldn't it be safer to be waiting in open air than inside of a building? Metrolinx could have delayed the switch I'm sure. Perhaps costly, but you know what, better safe than sorry
It's open for people who need to use GO bus services.

...and besides, there is lot more standing area in the new station for those to keep safe distancing versus the old one. Two floors of it, in fact.
 

turini2

Active Member
Member Bio
Joined
Aug 20, 2020
Messages
445
Reaction score
1,664
Location
London, UK
If someone could upload a decent photo of the new bus terminal to Wikimedia Commons/Flickr under a creative commons licence (i.e. no copyright) that would be great - trying to find a photo of the new bus terminal for the wikipedia article is proving to be a pain!
 

turini2

Active Member
Member Bio
Joined
Aug 20, 2020
Messages
445
Reaction score
1,664
Location
London, UK
Kind of surprised they went and opened the bus terminal in the midst of the pandemic... wouldn't it be safer to be waiting in open air than inside of a building? Metrolinx could have delayed the switch I'm sure. Perhaps costly, but you know what, better safe than sorry
Metrolinx 100% could not have delayed the switch - they signed a deal with the developer that hands over the old bus terminal site in exchange for a 99 year lease on a bus terminal. I suspect the contract says something along the lines of "New bus terminal complete? Hand over the old bus terminal, thanks"
 

union2pearson

Active Member
Member Bio
Joined
Jan 22, 2015
Messages
155
Reaction score
761
Thanks. So in other areas like several go projects and stations, most recently Kipling station. Any idea what common challenges elevators present? Is it the certification process ?

Yes, you are correct in regards to certification. It is a process that includes multiple stakeholders, certifications and a thorough commissioning process is that I am aware of. There could be multiple other factors involved that may hinder the in service readiness that I may not be able to speak to. I hope that helps a bit.
 

opalz

New Member
Member Bio
Joined
Oct 26, 2012
Messages
16
Reaction score
18
Location
Mississauga
This is one of my favorite projects in Toronto in terms of architectural design. I feel like more developers should look in to creating and interesting building instead of just putting something up to keep up with the demand.
 

westtoeast

Active Member
Member Bio
Joined
May 26, 2018
Messages
229
Reaction score
950
A couple final features that we've yet to see in action that I'm looking forward to:
  1. The building signage...will CIBC do some sort of more muted rebranded signage here as discussed several pages ago or will we get the garish red and yellow logos on every face of the crown?
  2. The diamond lighting! Really looking forward to this one, hope we start seeing some testing on it soon.
 

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
16,130
Reaction score
17,923
Location
St Lawrence Market Area
Kind of surprised they went and opened the bus terminal in the midst of the pandemic... wouldn't it be safer to be waiting in open air than inside of a building? Metrolinx could have delayed the switch I'm sure. Perhaps costly, but you know what, better safe than sorry
Why? It's a large and apparently quite well ventilated area and they insist on masks (and I would say that being in the terminal is far 'safer' than being on a bus!). Maybe more importantly, the CIBC folk want to get on with Phase 2.
 

sikandar

Active Member
Member Bio
Joined
Aug 15, 2010
Messages
330
Reaction score
2,248
December 6 - if you look closely you’ll see the crane taking itself apart :)

08E505D2-4E20-4EBF-B2F8-EF50BA41F719.jpeg
 

WillTo

Active Member
Member Bio
Joined
Apr 12, 2015
Messages
989
Reaction score
1,821

Full Metal Junkie

Active Member
Member Bio
Joined
Apr 27, 2018
Messages
550
Reaction score
1,804
Location
Humber Bay Shores
Seems like there are a set of "regular" men's and women's bathrooms on each level.

Then each floor also has 2 (?) unisex individual bathrooms.

That should make this guy happier:


Yes, but how many stalls per washroom are there? It matters:

 

Student99

Active Member
Member Bio
Joined
May 18, 2008
Messages
587
Reaction score
250
It's open for people who need to use Go bus services.

...and besides, there is lot more standing area in the new station for those to keep safe distancing versus the old one. Two floors of it, in fact.
hmmm More standing room yeah, but it's indoors. I think after 6 feet it's not a big deal if you're 10 feet vs 20 feet; what would be more important is the ventilation. Any doctors on here that can chime in?

Metrolinx 100% could not have delayed the switch - they signed a deal with the developer that hands over the old bus terminal site in exchange for a 99 year lease on a bus terminal. I suspect the contract says something along the lines of "New bus terminal complete? Hand over the old bus terminal, thanks"
yeah but PANDEMIC. That wedges in more room for negotiation. We are seeing flexibility around the world right now. A loud voice amplified here or there moves mountains.
 