Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
GOD I HOPE SO! Just another reason to tear that elevated piece of cr*p highway down. Wishful thinking ;)
Sadly, it would likely be the glass that gets muted, not the Gardiner that gets replaced. But, luckily, they've likely thought ahead on all this.
 
I Love It.gif
 
This is the top shelf showpiece tower we've been waiting for since the beginning of this current building 'cycle' ....which began around 2007. One Bloor came very close but this one is delivering on every level: design, size, quality, height, and its office to boot. The One will likely bump Toronto's total to 2. A 12 year wait? No one can say we haven't been patient.
 
More of everything but looks the same, Friday

Westside

UP

196428


Bottom (no jokes please)
196429


Eastside

196430


A closer look at the southwest retail building shows the concrete roof; eventually to be a green roof; has been poured. We're still waiting for the 4th-floor concrete to be poured.

196431


A closer look at east side elevator and emergency stairs, tower in progress, and a new extension for the concrete pump that's between crane#3 and crane#4 has an extension in progress

196432
 
More of everything but looks the same, Friday

Westside

UP

View attachment 196428

Bottom (no jokes please)
View attachment 196429

Eastside

View attachment 196430

A closer look at the southwest retail building shows the concrete roof; eventually to be a green roof; has been poured. We're still waiting for the 4th-floor concrete to be poured.

View attachment 196431

A closer look at east side elevator and emergency stairs, tower in progress, and a new extension for the concrete pump that's between crane#3 and crane#4 has an extension in progress

View attachment 196432
Stitched!
Untitled_Panorama1.jpg
 
196464




Construction Notice

Please be advised that construction crews will be on-site this Sunday, July 28th to raise the workers and material hoist. This work is being completed to maintain access with the tower as it continues to rise and will occur between the hours of 9 a.m. and 5 p.m. It is not expected to produce significant noise.

We thank you for your patience as we complete this work.

Thank you.
 

Back
Top