Probably just digging up the parking lot paving.
Probably just digging up the parking lot paving.
Probably just digging up the parking lot paving.
Really? No shoring first? Unless the lot previously had shoring installed for some other proposal that isnt coming to mind (could be the case, I can think of a half dozen parking lots around the city that have shoring along at least a couple sides
I've heard this will be capped at the ground, so in essence, the parking lot will just be repaved.
Great, thanks khristopher!
It says he plans on taking a pic every day and produce a time lapse sequence over time. That would be most interesting.
How far south does the subway platform at College go? I don't think it extends all the way down to the Aura site, but not sure. I'm pretty sure the subway tunnels are directly below Yonge Street as the alignment shifts between College and Wellesley. I would expect similar engineering challenges here with respect to the subway as Shangri-la dealt with during the engineering design phase and excavation.
I do plan to take a photo everyday. I'll compile the sequence into a time lapse video every once in a while (maybe once a month or so) as well as creating occasional single-day time lapse videos, like the two I've posted so far.
The platforms don't extend that far south. During the planning process there were exploratory discussions with the proponent, city of toronto planning staff and the TTC regarding a new secondary entrance/exit to College Park station via the Aura extension to the College Park PATH system. The discussions didn't advance very far as it was deemed unfeasible in part due to the location of the station box and other subsurface structures and utilities.
Do the Aura plans leave space for the possible PATH connections to the Delta Chelsea or Ryerson University?
Do the Aura plans leave space for the possible PATH connections to the Delta Chelsea or Ryerson University?