Toronto 500 Sherbourne | ?m | 34s | Times Group | Northgrave

drywall

all units up to the 24th floor have been dry-walled; the studs are up to floor 29. The building is coming along very nicely.
 
Pictures taken 27th Oct

It's been awhile since the last round of pictures. The sun came out for a little so we quickly took a few shots.

Here's the entrance to the lobby on Wellesley Lane.
13933_162334378540_661213540_2811137_3159511_n.jpg


Entrance to the lobby on Sherbourne Street. I like the steps to the door.
13933_162334393540_661213540_2811138_5778075_n.jpg


West side of the loft looking quite good.
13933_162334413540_661213540_2811140_8069400_n.jpg


Wokers installing cladding on the west side of Elite Tower
13933_162374778540_661213540_2811503_1616342_n.jpg


East side of loft.
13933_162334418540_661213540_2811141_6839611_n.jpg


A look at the model suite, still WIP at this point. Furnitures should be in soon.
13933_162333358540_661213540_2811085_2326834_n.jpg


A look outside from inside the model suite. Apologise for the bad lighting.
13933_162333378540_661213540_2811088_7035805_n.jpg


Picture of the bathroom on the ground floor of model suite.
13933_162333403540_661213540_2811091_6268318_n.jpg


The following pictures are taken on 25th Oct from balcony of 1610.
West view.
13933_162332653540_661213540_2811071_6209411_n.jpg


North West view
13933_162332663540_661213540_2811072_6299885_n.jpg


North view
13933_162332673540_661213540_2811073_3468680_n.jpg


North East view
13933_162332688540_661213540_2811074_5116418_n.jpg


That's all I have for now. Hope you enjoy them.
 
Last edited:
These are the only 2 south views I have. The quality is horrible thou, sorry.

Click on thumbnail to enlarge.
 

Attachments

  • s.JPG
    s.JPG
    79.1 KB · Views: 268
  • se.JPG
    se.JPG
    70.1 KB · Views: 271
Taken 2nd Dec

It's been awhile since the last picture update. Much had happened during Nov. We finally got our letter informing us of the PDI & move-in date. Very exciting.

The weather has been very kind for the construction. No few wet days, no snow yet, not too cold for them when working on the exterior.

Enough said, here are the pictures we took today...

South side of building
12935_188737423540_661213540_3026623_1012559_n.jpg


North side of building
12935_188737443540_661213540_3026625_4352661_n.jpg


North East corner (all the balconies for the corner units are fully "cladded")
12935_188737433540_661213540_3026624_237791_n.jpg


Close up of the North side. Check out the dividers for shared balconies & the railing on the 23rd floor.
12935_188737453540_661213540_3026626_5354922_n.jpg


Different view showing the same thing...
12935_188737408540_661213540_3026620_1132714_n.jpg


Close up of the shared balconies on the North side.
12935_188737458540_661213540_3026627_6104443_n.jpg


West side of the building. They are finishing up the cladding
12935_188737413540_661213540_3026621_779452_n.jpg


South West corner of the building.
12935_188737418540_661213540_3026622_3612112_n.jpg


Well, hope you enjoy the pictures.
 
thanks for the continued picture updates! I still cant believe how fast they've gotten to this point. Not quite 17 months since I made this pano of the site when they were at ground level:

2682618316_5452a2746d_b.jpg
 
Jan. 16th Update

From my POV, today at 4pm

Click on the thumbnail to enlarge, then click again on the image for full size.

 