Toronto Solaris at Metrogate Condos | ?m | 40s | Tridel | Graziani + Corazza COMPLETE

only 2 towers (Solaris 1+2) is currently under construction, which will be 40 storeys each

the next 2 towers (Ventus 1+2) will be 30 storeys each but have not begun marketing as of yet ~
 
So...

Did the towers sell easily??

Also how tell are they??

Easily seem like 400 foot towers...
 
Solaris' Height

lordmandeep ... I had a similar question previously and TWM responded

It was confirmed that Solaris to the top of mechanical penthouse is 127 m / 417 ft :)

From the ground level floor to the parapet the height is 121 m or 397 ft..

Interesting. What about the height to the actual top of the buildings? (top of the mechanical penthouse?) ;)

Metrogate-eastedge.jpg

Height of Solaris is 127m - 417ft. That is the topmost part of the building from the ground floor (I just checked with the project manager - for some reason they have to calculate height from their drawings - for them a building starts from the footing).
 
Last edited:
Solaris Revised Construction Schedule

Found out about the construction schedule falling back 8 weeks because of all the rain.

The following is part of the end of summer notification that is being sent out to Solaris 1 and 2 purchasers today by email and letter. Purchasers can log in to mytridelhome.com:

Our construction teams are working very hard despite the poor weather last winter and the rain throughout this summer season, having finished the forming on the 3rd floor at your community. The garage area between your community and the second phase is well underway as well with our construction teams expecting completion of this garage by the end of the year.

With the poor weather we are behind in our progress estimates by about eight weeks. At key benchmarks in our construction process we conduct a detailed and formal review of the occupancy schedule against the actual progress in the community which is expected mid to late fall. Once completed, you will be notified of your revised occupancy date.
 
if a delay letter is in fact issued it would be silly ... it was just a couple months ago Tridel sent out a notice to pushed UP (earlier) the estimated occupancy by 2 months, and now occupancy may be pushed back ... that would mess up's people plans even more and get purchasers more upset (at least I know I would be)

Found out about the construction schedule falling back 8 weeks because of all the rain.

Thanks for being the bearer of bad news (unfortunately)

TWM ... word of advice to the management staff @ Tridel ... maybe they can keep their lips tight next time until THEY KNOW FOR SURE before deciding to send out early occupancy notices next time and replacing it with a delay notice several months later ... the management team may as well as have stayed quiet and said nothing and it wouldn't have bothered anyone, rather than saying 'we are ahead of schedule' and then followed by 'we are behind schedule now' ...

IMO this is simply more frustration from purchasers' standpoint :rolleyes:

my apologies ... end of rant ~
 
September 19 2009 update

Solaris 1 starting 4th floor, Solaris 2 @ 2nd floor



IMG_1597.jpg


South Side

IMG_1598.jpg
 
Last edited:
September 29 2009 update

View of Solaris from a new angle (looking south across Village Green Square) on this not so pretty day ~
IMG_1616.jpg
IMG_1617.jpg


The future entrance to Solaris 1+2
IMG_1618.jpg
 
Daily Commercial News

Checking the plans for Solaris at Metrogate in Toronto
October 6, 2009

140.jpg

HOWARD MANDEL/APERTURE IMAGING


Workers study the drawings at the Solaris at Metrogate Phase I and II in Toronto. Deltera Inc. is general contractor for the two, 40-storey towers with 868-units, ground floor retail and six-levels of parking above and below grade.

The project was designed by Graziani + Corazza Architects Inc. Consultants are Sigmund Soudack & Associates Ltd. (structural) and Novatrend Engineering Group Ltd. (mechanical/electrical).

Subcontractors include: Coreydale Contracting Co. (excavation); Rumble Foundations (Ontario) Ltd. (shoring/caissons); C & T Reinforcing Steel Co. (1987) Ltd. (rebar); Edvac Contracting Ltd. (formwork); Global Precast; Roman Metal Fabricating Ltd. (structural); Dufferin Concrete; Gottardo Masonry; Network Mechanical Inc. (plumbing); Bellwood Sheet Metal Ltd. (HVAC); Mayfair Electric Ltd.; Toro Aluminum Ltd. (windows); and ThyssenKrupp Elevator Ltd.


http://www.dailycommercialnews.com/article/id35620
 
October 11 2009 update



Solaris 1 @ 5th Floor
IMG_1655.jpg


Solaris 2 @ 3rd Floor
IMG_1654.jpg


South + Southeast Elevations from Highway 401
Click to Enlarge
 
Last edited:
Solaris Camera

We contacted our supplier and the link seems to be working again.

Thanks for letting me know about the problem.
 
Last edited:
Solaris Construction Photos- Saturday, October 24th- 17:00

Here are four photos of the Solaris construction that were taken Saturday, October 24, 2009 around 5:00pm.

From the north looking south.
20091024construction01.jpg


20091024construction02.jpg


20091024construction03.jpg


From the south west of the Delta's parking lot.

20091024construction04.jpg
 
November 1 2009 update

Progress sure seems slow at Solaris (or maybe its just the 'purchasers anticipation') ...

hopefully the speed will pick up now that the 4 storeys podium is completed and work will commence on the typical tower floors ~ :)



Solaris 1 @ 6th floor
IMG_1800.jpg


Solaris 2 @ 5th floor
IMG_1801.jpg
 
Last edited:
November 8 2009 update

Views of Solaris from Highway 401
 
November 14 2009 update



Solaris 1 @ 7th Floor
IMG_1825.jpg


Solaris 2 @ 6th Floor
IMG_1826.jpg


Future Daycare in the ground floor of Solaris 2
IMG_1827.jpg


Parking Situation on Ventus' Opening Weekend
IMG_1828.jpg
 
Last edited: