News   Dec 20, 2024
 1.6K     7 
News   Dec 20, 2024
 981     2 
News   Dec 20, 2024
 1.8K     0 

Roads: Ontario/GTA Highways Discussion

This is also the most busiest section of the 401 as all the freight traffic from Rexdale industrial area is trying to get somewhere. Perhaps if some of these traffic can be rerouted to the 427 North to the 413.
Or 407; it's already there, they jut need better rates.

Drivers, especially commercial, will take the route that most benefits them. It's a time vs money thing.
 
This is also the most busiest section of the 401 as all the freight traffic from Rexdale industrial area is trying to get somewhere. Perhaps if some of these traffic can be rerouted to the 427 North to the 413.
There's also this no-person land called Pearson Airport, that detours traffic around it.
 
Public Information Centre #2 for the Highway 3/4 Twinning/Talbotville Bypass project in St. Thomas will be happening on November 22, 2023.

IMG_9232.jpeg
 
The slide deck from the second Public Information Centre for the HWY 3/HWY 4 St. Twinning Project in St. Thomas and Talbotville is now available on the MTO Project Website. They have finalized the interchange/intersection designs and have also come up with preliminary staging over a 5-year construction timeline. They are going to move to detail design in spring/summer 2024, targeting a construction start in 2025, which is very aggressive. They plan to start at the HWY 4 side, building the new alignment over to Wonderland, as well as twinning the Kettle Creek Bridge. I have taken some screenshots of the slides:

HWY3PIC1.png
HWY3PIC2.png
HWY3PIC3.png
HWY3PIC4.png
HWY3PIC5.png
HWY3PIC6.png
HWY3PIC7.png
HWY3PIC8.png
HWY3PIC9.png
 
...and additionally, the first Public Information Centre was held recently for the HWY 40 Twinning Project in Sarnia, and the relevant information is posted on that MTO Project Website. This one is far less interesting of a project, however, since everything will be at-grade with traffic lights at intersections. They are planning on closing and realigning some streets that run near HWY 40 to better control access, as well as closing access to some small industrial roads. The recommended plan looks like this:

HWY40PIC1.png
 
If they put bus lanes on the Gardiner and extend the ones on the DVP straight to downtown then that immediately makes transit an attractive option. This could be very useful when they finish RER and sometimes we get the "shuttle bus" experience like on TTC.
 
Highway 27 (between Eglinton and Steeles) is still maintained by Toronto.

Black Creek Blvd. was to be a southern extension of Highway 400 to Weston Rd., is still maintained by Toronto.

Spadina Expressway, now known as Allen Rd., between Sheppard and Eglinton, is still maintained by Toronto.

Other former provincial highways have been maintained by Toronto for decades now. Highway 2, aka Lake Shore Blvd. and Kingston Road; Highway 5, aka Dundas Street West, Bloor Street, and Danforth Road; Highway 11, aka Yonge Street; Highway 11A, aka University Avenue and Avenue Road; Highway 48, aka Markham Road; Highway 50, aka Albion Road.
 
It would be nice if they extended the St.Thomas by-pass to the 401. As it is this is a pretty marginal improvement to bypass a stoplight in Talbotville.
I have a feeling that planning a full 401 connection is the next step in the process after they get this initial section past the design phase. This project can move this fast because a lot of work has been done in advance - the right-of-way for a twin roadway is already graded most of the way through and functionally just requires a handful of new overpasses and interchanges, with very little of this being on a new alignment.

A third section westward connecting to the 401 with a freeway-to-freeway interchange will arguably be more complicated and take longer since it would require both a brand new alignment and a more complicated interchange structure. Getting the basic 4-lane connection with Colonel Talbot/Sunset was likely deemed satisfactory in the meantime so they don’t have to rush the full freeway connection.
 
I have a feeling that planning a full 401 connection is the next step in the process after they get this initial section past the design phase. This project can move this fast because a lot of work has been done in advance - the right-of-way for a twin roadway is already graded most of the way through and functionally just requires a handful of new overpasses and interchanges, with very little of this being on a new alignment.

A third section westward connecting to the 401 with a freeway-to-freeway interchange will arguably be more complicated and take longer since it would require both a brand new alignment and a more complicated interchange structure. Getting the basic 4-lane connection with Colonel Talbot/Sunset was likely deemed satisfactory in the meantime so they don’t have to rush the full freeway connection.

If this Highway 3 freeway ultimately connects to the 401... you have a chance to perhaps renumber it... as the 403!

The current 403 could be renumbered to something else... with the Gardiner now going into provincial hands you could maybe have 403/QEW-403/QEW/Gardiner become a new highway number. The QEW itself would just run from Burlington to Fort Erie.

You could even number it 402 all the way to DVP (possibly 404?) with a cosigned section with the 401 between London and Woodstock.

Way too early to know if the DVP/Gardiner will get numbers but its fun to spitball for sure.
 

Back
Top