Fritter
Active Member
Could one of the main reasons for this be the costs of maintaining operations on an existing highway (building detoured right of way and re-establishing original, temporary structures etc.) and staging around that, as opposed to building what is needed, no limits, on greenfield?also shows how greenfield highway construction is a lot cheaper than rebuilding existing highway