AlvinofDiaspar
Moderator
Filip:
But that doesn't really make any sense - considering that ridership on Eglinton will not likely require a 6 car heavy rail subway line anytime within the planning horizon. It would be no different from insisting that we build a chunk of Sheppard when there is no need for subway level capacity and then insist of BRT as the solution for points beyond just because one day you *might* get heavy-rail subway level ridership for the entire line.
AoD
But that doesn't really make any sense - considering that ridership on Eglinton will not likely require a 6 car heavy rail subway line anytime within the planning horizon. It would be no different from insisting that we build a chunk of Sheppard when there is no need for subway level capacity and then insist of BRT as the solution for points beyond just because one day you *might* get heavy-rail subway level ridership for the entire line.
AoD
Last edited: