News   Jul 12, 2024
 1.6K     0 
News   Jul 12, 2024
 1.2K     1 
News   Jul 12, 2024
 459     0 

GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

Presumably the floor of the box drains to somewhere and they can simply hose down the inside of it from time to time.
However, I do suspect that the fritting and shadowing are intended to disguise a build-up of dirt over time.

The finish of the glass is also used to exaggerate the effect of the lighting inside the box as well.

Dan
Toronto, Ont.
 
April 29
8700929672_1f483b1045_b.jpg


8699806687_87e21dcba8_b.jpg


8700932008_530bd2c3d0_b.jpg


8699809281_1b1cae64c9_b.jpg


8699810395_d9d9934985_b.jpg


8699811511_99877a75f6_b.jpg


8700936266_5b556a78c7_b.jpg


8700937274_47732b1271_b.jpg


8700939496_1f6f61b99e_b.jpg
 
Actually, no. The copper cladding I saw was on the outside of the old southernmost train shed at its east end. Visible from Yonge Street.

That photo shows the outside of the south end of the trainshed. Copper is visible.

It's more obvious from Bay Street (the train shed doesn't extend to Yonge), but it's definitely there in that photo.
 
They have started installing glass on the wall between platforms 24/25. Also, getting ready to pour concrete on the final 'open' section of platform 24/25.
New 'Y' shaped columns erected mid-way through the new new glass roof, one on platform 24/25 and another on 20/21. These will presumably hold the departure info screens.
 
There are track signals at the midpoint as well which seems to be the reason parts of the shed structure under the glass roof haven't been demolished so perhaps the Y shaped columns are for that.
 
They have started to reinstall track (old 12 tracks) 24 at the west end including the switch. Noting for track 11 yet.
 
It is still Track 12. They aren't renaming them.

Dan
Toronto, Ont.

Did I say that??? Didn't put platform as 24

May 5 shots
8729350822_4c7d913cae_b.jpg


8729352400_68ce72fe50_b.jpg


8728316153_dcfcb3f66b_b.jpg


8729433890_90d4e6275f_b.jpg


8729349376_d7c46d066c_b.jpg


New Walkway bridge over the tracks
8729346910_12db58dabd_b.jpg
 
That looks like a newly refinished stairway to the platform. I thought that other than on dedicated heritage platform they were going to glass stairwells to improve sightlines.
 

Back
Top